Moving Offices? Here’s How to Plan Your IT and Technology
An office move usually means a business is growing, and that is good news. But it is also one of the harder projects a business will take on.
The lease, the build-out, the furniture and the moving date all run on their own timelines. Technology tends to land on IT’s desk a few weeks before the trucks arrive. And by then, most of the decisions that shape it have already been made.
That is why IT, or your MSP, should be in the room before you sign the lease. A building can look perfect on a tour and still be a poor fit for how your business runs. How much power does the floor have? Is the existing cabling usable, or is it a decade-old tangle nobody ever labeled? Can you get into the telecom closet? Will the landlord let a provider run new fiber or put equipment on the roof?
These answers are much easier to negotiate into a lease than to discover after it is signed.
Let’s look at the reasons why.
Step 1) Network and Infrastructure Design
Start with the internet, because everything else waits on it.
A dedicated fiber circuit that needs new construction can take 60 to 120 days or longer. Very little of that time is spent on the install itself. Most of it goes to permits, construction to bring the line into the building, and getting the landlord to approve cable runs through shared space.
If a provider already serves the building and the route is in place, the wait can be much shorter. That is exactly why you ask before you sign. And once the provider confirms the route, place the order right away, because a late circuit is one of the most common reasons move dates slip.
Then think about what happens when that line goes down. If your team stops working when the internet stops, a second connection from a different provider is worth the cost. Ideally, it enters the building by a different path, so a single cut line cannot take out both.
A Move is a Good Time to Upgrade Equipment
Aging equipment is a finance decision as much as an IT one. Ask for a side-by-side estimate of moving versus replacing each major item, covering labor, remaining useful life, and whether the vendor still supports it. The answer often surprises people.
A five-year-old firewall (the device that guards your network) or switch (the device that connects wired equipment) can cost more in labor to move than it is worth. So, if something was already close to replacement, the move is a good time to let it go.
Cabling and Wireless Internet Should Happen Early On
Once you know what is coming, the cabling can be planned, and it has to happen before the walls close up or the furniture arrives. That means Cat6 or Cat6a runs (the standard network cabling) to every desk, printer, camera, and access point location, plus a fiber backbone between floors in a multi-floor space.
Wireless runs on the same timeline, but it needs a site survey, a walk-through that measures real coverage. A floor plan cannot tell you how glass conference rooms or wall materials will affect the signal. And a design done on paper alone tends to leave dead spots in the places people gather most.
Network closet design
All of that cabling runs back to one place, and the network closet usually gets less attention than it deserves. It needs rack space, enough dedicated electrical circuits for the equipment, and proper ventilation and cooling. Restricted airflow or warm intake air can trigger thermal alarms and protective shutdowns, and the problem tends to get worse as equipment is added over time. Battery backup belongs here too, so critical systems can ride out a short outage and shut down cleanly during a long one.
Phone migration
Phones and telephone operators operate on their own timeline, and it is easy to miss until it is too late.
Number porting, the transfer of your numbers to a new provider, takes time. The FCC advises against canceling service with your current provider before the port is complete, because doing so can cost you the numbers entirely. That is hard to undo for a business whose clients have been dialing the same number for years.
There is also a safety piece. For business phone systems covered by the FCC’s multi-line telephone system rules, 911 calls must carry a dispatchable location, meaning the street address plus details like floor or suite. The move is exactly when those records go stale, so, update and test them before moving day.
Step 2) Bake Security Measures into Your Move
Physical security and cybersecurity used to be treated as separate problems. Facilities handled the doors and IT handled the network. They are far more connected now.
The DarkVishnya attacks show why. According to Kaspersky, criminals walked into banks in Eastern Europe posing as couriers, job seekers, and visitors, then plugged small devices into the network in meeting rooms and under desks. From there, they reached internal systems remotely and caused losses estimated in the tens of millions of dollars. Every one of those attacks started with someone walking through the front door.
And getting through the door is easier than most people assume. A survey by Boon Edam found that 71% of security professionals consider their organizations highly vulnerable to tailgating, where someone simply follows an employee through a secure entrance. People are being polite, and that is what makes it so hard to stop.
A new space is the easiest time to design against this. Plan badge access and door security, and cameras where they make sense. Give the network closet its own lock and its own access list, separate from the front door. And turn off network jacks in lobbies and open meeting rooms until someone needs them—an active jack in a shared space gives a visitor the same opening DarkVishnya’s attackers use, for example..
Step 3) Ensuring Continuity of Data Systems
Before anything gets unplugged, confirm your backups are current, and then prove they work.
A Veeam study found that 58% of backups fail when organizations try to recover from them. A backup that has never been restored is an assumption, and a move is when assumptions get tested. Run a real restore of something that matters, time it, and keep a copy offsite until the new office is stable.
A move is also a natural point to ask whether some servers need to make the trip at all. Anything already due for replacement is a strong candidate to move to the cloud, which means less hardware to relocate and less power and cooling to plan for in the new closet.
Step 4) Plan for People and Change Management
Tell your team the timeline early, along with what will change for them and what they need to do. Day one should start with the new WiFi details and simple login steps already in hand.
Staff the helpdesk more heavily during move week, because that is when things break and people panic. And keep a remote work plan ready in case the new site is not fully ready on the target date. Build-out delays are common, and a team that can work from home for a week loses very little.
Congratulations, You’ve Moved Offices. What Comes Next?
Once you are in, run a full systems check. Test every workstation, printer, phone, and connection, including the scan-to-email and door badge integrations that nobody thinks about until they fail. Keep a punch list for lingering issues and work through it over the following weeks.
Then close out the old space properly. Remove the equipment and wipe any drive that is not coming with you to a recognized standard such as NIST SP 800-88. That includes the drives inside copiers and printers, which store more than most people realize. Walk the space one last time before handing back the keys.
An office move will always bring surprises. The businesses that bring IT in before the lease is signed spend their first week getting work done. The ones that wait tend to spend it finding out why the internet still is not connected.
Build an Secure Office Migration Strategy with The Right Help
The Astute Technology Management team has been helping businesses plan office migration and expansions for decades, while ensuring that security is maintained throughout the process. If you have any questions, feel free to contact us at 614 389 4102 or at [email protected], our staff in both Columbus and Cincinnati is ready to help!